It will take me a bit. I am about to drop around $400 on some material, Wires, molds, skirts, thread, blades and paint to pump out approx 8 different lures. If I can find the right mold, I might be able to get another couple ready to go.
I am almost finished melting all the lead into ingots, I have weighed everything, I have 165 lbs of lead sitting here currently along with another 150-200 sitting at a shop waiting for me to pick it up. I really need a second melter to really get things moving, 20 minutes to melt 10 pounds and 30 seconds to pour the ingots isnt working out to be the fast way of doing things. It would take me nearly 10 hours to melt down 200 pounds of lead.